Energy, 2023
Meridian
An asset registry for a grid operator, tracking two million pieces of network equipment.
- Sector
- Energy
- Year
- 2023
- Duration
- 11 months
- Team
- 6 engineers
- Focus
- Architecture
Architecture, 7 components
- Client
- Service
- Queue or log
- Data store
- External system
The problem
Asset records lived in spreadsheets and a legacy GIS export. Field crews and planners worked from different versions of the network, and every change needed an audit trail for the regulator.
What we built
- 01Modelled the network as a versioned graph in PostgreSQL with PostGIS for geometry.
- 02Recorded every change as an append-only event, so any past state can be reconstructed.
- 03Built an offline-capable field app that syncs through the same typed API as the planning tool.
- 04Generated regulatory reports from the change log instead of manual exports.
What changed.
- assets in one registry
- 2M
- of changes traceable for audit
- 100%
- to produce the annual report, from 5 weeks
- 3 days
Stack
- Node.js
- TypeScript
- PostgreSQL
- PostGIS